Jail Facility Planning

Frequently Asked Questions



A: The November 2025 bond measure did not receive the voter approval required for passage. The condition and operational limitations of the existing jail remain, so the County has continued evaluating those needs and potential options. 

A: The study identified significant challenges involving capacity, inmate classification, intake and booking, staff supervision, security, behavioral-health space, accessibility and aging building systems. Elevatus Architecture concluded that many of these deficiencies cannot be addressed through renovation of the existing facility. 

A: No final decision to proceed with construction has been made. The 2026 Jail Study recommends replacing the existing facility. The County is continuing its planning process, and key decisions regarding location, final design, funding and implementation have not been finalized.

A: No final site has been selected. The 2026 Jail Study evaluated three potential locations using factors such as available land, utilities, access, future expansion potential, surrounding uses, development costs, and proximity to County and emergency services.


Based on the criteria evaluated in the Study, Elevatus identified Site B as its recommended location. Since completion of the Study, Site B has been determined not to be a viable location, and the Board of County Commissioners is evaluating additional potential sites.


The Study's recommendation reflects the technical evaluation completed at that time. It does not represent a final County site selection.

Site Selection

A: Many of the jail's most significant challenges are tied to the building's size, configuration and site. The study found limitations involving supervision, classification, intake, security, accessibility and building systems that cannot be fully addressed through renovation.

Current Jail Conditions

A: The study recommends planning for approximately 192 detention beds plus 30 work-release beds, for approximately 222 total beds.

Facility Concept

A: The existing jail has a rated capacity of 69 beds. The study's recommendation considers projected population growth as well as the need to maintain available space so individuals can be appropriately separated by sex, security level and other classification requirements.

A: The conceptual facility includes a dedicated four-bed behavioral-health unit as well as additional space intended to support medical, mental-health and program needs.

A: The July 2026 Jail Study estimated approximately $61.8 million in hard construction costs and a total planning-level project budget of approximately $71.1 million to $74.2 million after estimated soft costs.


These estimates are for planning purposes. Actual project costs would depend on factors including the eventual site, final scope and design, construction timing and market conditions.

Facility Concept

A: A final funding approach has not been established. Funding would be determined as the County's planning process continues.

A: Before the 2025 bond election, the County had information about the condition, capacity and operational challenges of the existing jail as part of its broader facility planning efforts. However, it had not completed a comprehensive study focused specifically on the Jail.


Following the election and community feedback requesting more detailed information, the County engaged Elevatus Architecture to conduct the 2026 Jail Study. The study provides a more detailed analysis of existing facility conditions, projected bed and staffing needs, potential sites, space and operational requirements, a conceptual facility design and planning-level project costs.


The study gives the County and residents additional information to evaluate the need and options as facility planning continues.

A: Residents can participate in the current Jail Facility Planning Survey using this link:

Survey